turbocor-chillers

In partnership with Kier, Nationwide have been awarded a large contract for the supply and installation of four Airedale chillers with Turbocor technology.

With a combined duty close to 2Mw witness testing in conjunction with consultants Troup, Bywaters + Anders was  required. This took  place at the new Airedale facility in Leeds with chillers  tested at full and part load, refrigerant leak detection testing and safety device testing.

The chillers passed the tests and were selected for the following reasons;

  • Intelligent, self-optimising compressors
  • Near silent, oil-free operation and ultra-efficient, variable speed control
  • Ability to match load requirements exactly and enables selection of the optimum model
  • Exact capacity match and using substantially less power at part load
  • ESSER >6

Nationwide have a proven track record in fast paced, critical chiller replacement projects delivering turn arounds within less than 24 hours where required and practicable to avoid costly down time to our Clients.

To find out more visit our website; www.ngukltd.com or call 0800-093-8641