Crowne Plaza (IHG)

Crowne Plaza (IHG)

Chilled Water Client: Crowne Plaza (IHG) Location: Blackfriars Sector: Hotel Duration: 4 days Value: £210,000 Project Brief: The Crowne Plaza The City hotel had two chillers past life expectancy and one with total failure. Nationwide were contracted to design, supply...
David Lloyd Leisure

David Lloyd Leisure

Chilled Water Client: David Lloyd Leisure Location: Brighton Sector: Leisure Duration: 5 days Value: £79,000 Project Brief: Nationwide are contracted to deliver the chiller replacement project at David Lloyd Brighton with minimal down time to avoid member complaints....
Premier Foods

Premier Foods

Chilled Water Client: Premier Foods Location: Leicester Sector: Industrial Food Duration: 4 months Value: £200,000 Project Brief: Nationwide were contracted to provide a design and build R22 replacement and upgrade solution to Premier Foods potable water cooling plant...